All shipments are to be shipped from Port of Gdańsk, for which;

  1. All Shipments around the EU will take 2 to 3 days via Air Freight and Truck transport
  2. All Shipments around the Globe will generally take at least 7 days for preparation and 20 to 45 days for ETA
    For which the client shall be advised accordingly as to how long it will take his/her shipment to arrive at the destination port and also advised on the date of which the 14 days demurrage period starts for which all our cargos sent via container loaded on a vessel – we do ask our shipping agent to provide assistance at port of arrival.